Group 1 - Smart well C-43T2
Description of task:
This well has a DIACS (Downhole Instrumentation and Control System) completion with downhole
valves controlling the production from two zones.
Problem:
Use existing Eclipse model to history match the two year production to find the
production from the two zones.
Run predictions to decide future production while opening/closing the valves.
Based on simulations and real costs, calculate net present value for the well.
Group members:
Abraiz Akram, akrama@stud.ntnu.no
Antonio De Sousa, antonioj@stud.ntnu.no
Taimoor Khan, taimoor@stud.ntnu.no
Md. Golam Rabbani, rabbani@stud.ntnu.no
Emma Reinholds, emmar@stud.ntnu.no
Nasreen Banu, banu@stud.ntnu.no
Group 2 - Tenside flooding in the I1 segment
Description of task:
Group members:
Nasima Begum, begum@stud.ntnu.no
Dike Putra, putra@stud.ntnu.no
Richard Rwechungura, rwechung@stud.ntnu.no
Andinet Assaminew, assamine@stud.ntnu.no
Eko Awan Yudha Fitnawan, fitnawan@stud.ntnu.no
Group 3 - IOR by producing the Lunde formation
Description of task:
Group members:
Adnan Bin Asif, adnanbin@stud.ntnu.no
Otavie Imo-Jack, imojack@stud.ntnu.no
Van Pham, vanthiha@stud.ntnu.no
Bartlomiej Piela, piela@stud.ntnu.no
Ricardo Lorenzo Valle Tellez, valletel@stud.ntnu.no
Eldar Sadikhzadeh, sadikhza@stud.ntnu.no