Group 1 - Smart well C-43T2
Description of task:
This well has a DIACS (Downhole Instrumentation and Control System) completion with downhole valves controlling the production from two zones.
Problem:
  • Use existing Eclipse model to history match the two year production to find the production from the two zones.
  • Run predictions to decide future production while opening/closing the valves.
  • Based on simulations and real costs, calculate net present value for the well.


  • Group members:
    Abraiz Akram, akrama@stud.ntnu.no
    Antonio De Sousa, antonioj@stud.ntnu.no
    Taimoor Khan, taimoor@stud.ntnu.no
    Md. Golam Rabbani, rabbani@stud.ntnu.no
    Emma Reinholds, emmar@stud.ntnu.no
    Nasreen Banu, banu@stud.ntnu.no


    Group 2 - Tenside flooding in the I1 segment
    Description of task:

    Group members:
    Nasima Begum, begum@stud.ntnu.no
    Dike Putra, putra@stud.ntnu.no
    Richard Rwechungura, rwechung@stud.ntnu.no
    Andinet Assaminew, assamine@stud.ntnu.no
    Eko Awan Yudha Fitnawan, fitnawan@stud.ntnu.no


    Group 3 - IOR by producing the Lunde formation
    Description of task:

    Group members:
    Adnan Bin Asif, adnanbin@stud.ntnu.no
    Otavie Imo-Jack, imojack@stud.ntnu.no
    Van Pham, vanthiha@stud.ntnu.no
    Bartlomiej Piela, piela@stud.ntnu.no
    Ricardo Lorenzo Valle Tellez, valletel@stud.ntnu.no
    Eldar Sadikhzadeh, sadikhza@stud.ntnu.no