Integrated drilling Simulator with 3D Visualization shall be demonstrated and tested in order to show value creation and increased safety.
Well stability and pore pressure models should be integrated into the real time environment
Improved drilling procedures to enhance data quality and improve drilling performance.
Activities and deliverables
Demonstration of PPM and PSI in real time, Total well. Development and testing of improved methodology for the PPM manager and demonstrate the use of wellbore stability model PSI.
Demonstration and improvement of PPM and PSI on historical data (Statoil data)
Demonstration and improvement of IDS on floating installation (Statoil data). The main goal is to demonstrate the performance of IDS and secondly, to further improve heave handling.
Further demonstration with focus on improved calibration routines
Report from literature study of bit performance and rate off penetration modelling. Plan to make a paper within spring 2010
Conference or Journal paper on real time utilizing of Well Stability model
Report describing methods for handling of heave while using IDS and general analyses of operation using IDS
Report on the effect of improved calibration routines
PhD Project: “An ROP Model for Integrated Operations”